METHOD

SEQUENCE BEFORE SCHEDULE.

A schedule states when work should happen. A sequence proves how it can happen. Each operation prepares the next — then verification releases it.

THE CONTROLLED SEQUENCE  ·  01 — 08
01

SURVEY

Existing conditions are measured and recorded before anything is assumed. The site is the first drawing.

EXISTING CONDITION — RECORDED
02

ACCESS

Routes for people, plant, and material are fixed before work begins.

03
CARRIED UNTIL IT CARRIES ITSELF

TEMPORARY WORKS

Shoring and bracing carry the structure until it carries itself — inside operations that never pause.

04

FABRICATION

Components are cut, welded, and checked off the critical path.

05

DELIVERY

Loads arrive in lift order, sequenced to the hour — the building arrives in the order it stands up.

SEQUENCED TO THE HOUR
06

RIGGING

Every pick is engineered and rehearsed before the hook closes.

THE CRITICAL WORK
THE VISIBLE OPERATION IS ONLY THE FINAL MOMENT.
07

CLEARANCE

The envelope is closed and made weather-tight before fit-out.

08

VERIFICATION

Tolerances are surveyed and documented before handover is accepted. The condition is known — then it is released.

EVERY OPERATION PREPARES THE NEXT.

START WITH THE EXISTING CONDITION.
MODRA