INDEX / WORK

FOUR STRUCTURES.
FOUR RESOLVED CONDITIONS.

Daylit structural interior held in a regular column grid
Dark high-bay automated racking hall at Meridian Logistics
01  ·  CONCEPTUAL STUDY

MERIDIAN LOGISTICS

AUTOMATED DISTRIBUTION HUB  ·  OHIO VALLEY CORRIDOR  ·  2024

Racking, slab, and envelope sequenced as one operation across twenty-two months.

Precise interior of the Helix Fabrication plant
02  ·  CONCEPTUAL STUDY

HELIX FABRICATION

ADVANCED MANUFACTURING EXPANSION  ·  DESERT SOUTHWEST  ·  2023

Vibration-isolated slabs and a clean envelope for precision fabrication.

Sculptural concrete transit hall at Calder Crossing, blue hour
03  ·  CONCEPTUAL STUDY

CALDER CROSSING

CIVIC TRANSIT STRUCTURE  ·  PACIFIC NORTHWEST  ·  2022

Cast-in-place piers and a post-tensioned deck, poured over an active corridor.

Vast dark mill bay with machinery silhouettes at Line Nine
04  ·  CONCEPTUAL STUDY

LINE NINE

ACTIVE-PLANT STRUCTURAL RETROFIT  ·  GREAT LAKES SHORE  ·  2024

Crane girders replaced inside a live melt shop. Production never stopped.

NEW BUSINESS
START WITH THE EXISTING CONDITION.
MODRA